Minimum Stock Rules in OpenERP

         To automatically make stock replenishment proposals, you can use minimum stock rules. To do this, use the menu Warehouse ‣ Configuration Automatic Procurements ‣ Minimum Stock Rules.
         

        

      The rule is the following:
                If the virtual stock for the given location is lower than the minimum stock indicated in the rule, the system will automatically propose a procurement to increase the level of virtual stock to the maximum level given in the rule.

              List of Minimum Stock Rules
          
           The rule is based on virtual quantities and not just on real quantities. It takes into account the calculation of orders and receipts to come.
          You may find draft production or procurement orders to be created although they should not exist. That can happen if the system is badly configured . For example, if you have forgotten to set the supplier on a product. To check this, look at the list of procurements in the exception state in the menu Warehouse ‣ Schedulers ‣ Procurement Exceptions.
         
Once the rules have been properly configured, the purchasing manager only needs to look at the list of orders for confirmation with the supplier using the menu Purchases ‣ Purchase Management ‣ Requests for Quotation.

 Take the following example:

  • Products in stock: 15
  • Products ordered but not delivered: 5
  • Products in manufacturing: 2

The rules defined are:

  • Minimum Quantity: 13
  • Maximum Quantity: 25
  • Quantity Multiple: 3

       

          You can also set multiple quantities in the minimum stock rules. If you set a multiple quantity of 3 the system will propose procurement of 15 pieces, and not the 13 it really needs. In this case, it automatically rounds the quantity upwards.
      In a minimum stock rule, when you indicate a warehouse, it suggests a stock location by default in that warehouse. You can change that location by default when the scheduler completes, by location and not by warehouse.

Comments

Janeesh A: I have tested in OpenERP 7. It seems working. Procurement method should be 'Make to Order'. ".

Leave a Reply

Your email address will not be published. Required fields are marked *

  1. Dennis says:

     The information you gave is very good. I was searching how to get the stock rules on Open ERP. You saved me a lot of time. Thanks. Now I will be able to complete my work soon. And Nice one I learned. 

    _____________________________________________________________________________________________

    LEE CROUCHER

    1. Anonymous says:

      Hello,
      Such good way written, Please post more and more blogs, even for small points too

  2. Kareem Ayoub says:

    This does not seem to work in version 6.1, I put the settings correctly but no P.O is created. Do you have any clue? Thanks, Kareem.

  3. Anonymous says:

    I have created a product added the below details to it….. Product Type :Stockable Product ::: Procurement Method :Make to Stock ::: Supply method :Buy. I have also added a supplier to it and made the minimum stock rule as below… WAREHOUSE LOCATION MIN QUANTITY MAX QUANTITY PRODUCT UOM warehouse Physical Locations / warehouse / Stock 1.00 10.00 Each
    Also installed mrp_jit.?(i have made the scheduler run after a minute) what wrong i am doing above please help me on this

    1. Janeesh A says:

      I have tested in OpenERP 7. It seems working. Procurement method should be 'Make to Order'.

© 2020 Zesty Beanz Pvt Ltd All Rights Reserved.